
Services & Scope: HVAC System
Year of Completion: 2020
PROJECT SUMMARY (DESIGN AND SUPERVISION WORK)
HVAC System
The project installed Air Conditioning Load was 80 TR VRF System.
Services & Scope: HVAC System
Year of Completion: 2020
PROJECT SUMMARY (DESIGN AND SUPERVISION WORK)
HVAC System
The project installed Air Conditioning Load was 80 TR VRF System.