Scroll Top

PINNACLE BIOTECH

Architect Name: Surround Studio         Year of Completion: 2018

Services & Scope: HVAC, Plumbing & Fire Fighting System  .

PROJECT SUMMARY (DESIGN AND SUPERVISION WORK)

HVAC System: Complete HVAC System Design.

The project installed Air Conditioning Load was 100 TR. which includes 4Nos. inverter base

multiply (VRF System) unit with Fresh Air Units.

Plumbing System: Complete Plumbing System Design